Paint and tiles are not enough to choose a fixing. Gather wall and furniture information before deciding where to drill.
Before drilling, you need to establish whether the wall can support the shelf and which services may run through that area. A shelf for small objects still needs suitable fixings. If you cannot identify the wall material or rule out interference, leave installation pending a professional inspection.

Describe the wall without guessing what is inside
Note what you know from home or renovation documents and separate it from assumptions. A tiled wall may conceal different materials. A tapping sound or the appearance of an old hole must not become a diagnosis of strength here.
Gather the shelf reference, brackets and instructions. State what you intend to put on it and any planned change of use. This information helps assess the assembly; it does not let anyone calculate an allowable load from a photo or choose a wall plug solely by its trade name.
Fixing figures do not apply to every wall
The Fischer sheet consulted distinguishes building materials and provides different data for each. It also specifies screw and installation conditions. Do not take a concrete figure as the capacity of a hollow wall or multiply an isolated figure by the number of holes to decide how much to load a shelf. The choice needs checking for the complete assembly and actual conditions.
| Missing information | What to ask to have clarified |
|---|---|
| Wall material or thickness | How these will be identified before choosing the fixing |
| Shelf without a manual or with mixed brackets | Compatibility of the assembly and permitted use |
| Services with uncertain routes | How these will be located before drilling |
A detector helps, but does not give permission to drill
Bosch warns that its detector does not guarantee absolute safety and recommends checking other sources, such as plans or construction photos. Its modes have limits: detecting metal and detecting certain live cables are different functions. No signal does not prove there are no cables or pipes.
Moisture, materials and object positions can alter the reading. Do not use an uncertain result to choose another hole a few centimetres away. Identifying services and, where appropriate, isolating them before drilling must be left to the person carrying out the work with the necessary knowledge.
Prepare the enquiry without opening the wall
You can provide an overview photo of the area, another of the brackets and the shelf reference. Point out nearby sockets, switches or connections without asserting that their routes run in a particular direction. Ask whether a visit is needed to resolve what cannot be seen and what happens if the wall is unsuitable. Until then, avoid test drilling.